Residential institution of Megalopolis

Residential institution of Megalopolis

Demolition of four story building with underground connected with adjacent buildings of total surface 3,610 m2. The project was effectuated manually, non-vibrating diamond sawing was applied and the building was knocked down gradually within 30 days.